#1
|
|||
|
|||
unable to schedule to scheduled backups
I created too backups which both use the same copy script. One uses smart update and the other uses erase. My plan was to run the smart update one every day and once a month run a complete erase backup.
I scheduled the smart update one. Then i loaded the other settings file with the erase all and the same copy script. When I hit the schedule button it just jumps to the other schedule window and pulls up the edit dialog for the already existing scheduled item. I can't seem to add another schedule for the other back. I have tried several different things and every time, hitting the schedule button on the main dialog opens up the edit dialog for the already existed scheduled backup. Am I missing something or is this a bug? |
#2
|
||||
|
||||
Hold down Option when creating a second backup with the same drives...
__________________
--Dave Nanian |
#3
|
|||
|
|||
that did it. Thanks!
|
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Trouble with scheduled backups | rithban | General | 6 | 02-17-2008 09:40 AM |
Saving backups? Necessary for scheduled backps? | gcoghill | General | 2 | 12-09-2007 11:43 PM |
Scheduled Backups Don't Run | Drdul | General | 3 | 08-07-2007 06:45 AM |
Unable to get scheduled backups to work | glad4328 | General | 1 | 11-09-2006 02:28 PM |
Feature request: "Run scheduled backups NOW" option | ChicagoLarry | General | 1 | 09-11-2006 12:29 PM |