Backing up report error using 2 separate drives
Hi all,
Its been a while since I've needed to post here so hoping for as much as help as I needed when first starting out with SuperDuper! I have been backing up onto 2 separate external drives. Backing up once a week on one then rotating to the second drive. When I open up SuperDuper and look at the schedule reports it says that both drives were last backed up at the same time which seems incorrect as one is always a week or so out of sync with the other? Nothing too major but wondered if this is a bug or my incorrect use Thanks for reading and (hopefully) helping. Glen |
Are you looking at the log or the "Last copy" time in the scheduled copies window?
|
Hi Dave,
Thank you for replying so quickly. I am looking at the Last copy time in the scheduled copies window. Hope that helps. Sincerely -Glen |
Well, that's weird. Please delete and recreate the two schedules.
|
As it stands I think I would prefer to keep the anomaly than risk making a new set of schedules and doing it wrong... Thanks for the help
-Glen |
All times are GMT -4. The time now is 11:55 PM. |
Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.